Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
Νικου Πετρος
Center Number:
1
2
3
4
   
Candidate Number:
2
5
1
8
3
Module (shade one box):
Academic:
 
General Training:
Test Date:
1
D
6
D
   
0
M
3
M
   
2
Y
0
Y
2
Y
2
Y

The diagrams show the cross-sections of two tunnels, one joining France and Italy and the other joining two Japanese islands.

The diagrams show the cross-sections of two tunnels, one joining France and Italy and the other joining two Japanese islands. lM1aX
The figures compare cross-sections of a tunnel linking France and Italy and the other cross-sections of a tunnel linking Hokkaido Island and Japanese Island. It is clear that the railway tunnel is longer than the road tunnel. We also can see from the diagram that it took longer to build than the road tunnel. Firstly, there is an obvious difference between the depths of the tunnels. The Mont-Blanc road tunnel is lay under a mountain which is 3. 5km, while the maximum depth of the Seikan railway tunnel is 240km underwater level. In addition, the lengths of the railway tunnel are about 53. 85km, compared to the road tunnel is shorter, just 11. 60km. Furthermore, another difference between the two tunnels is that they spent more time constructing the railway tunnel. It took 8 years to build the Mont-Blanc road tunnel from 1957 to 1965. And the construction time of the Seikan railway tunnel in Japan was 42 years from 1946 to 1988. Additionally, the Japanese tunnel was built under the sea whereas the tunnel linking France and Italy was built under a mountain.
The figures compare cross-sections of a
tunnel
linking France and Italy and the other cross-sections of a
tunnel
linking Hokkaido Island and Japanese Island. It is
clear
that the
railway
tunnel
is longer than the
road
tunnel
. We
also
can
see
from the diagram that it took longer to build than the
road
tunnel.
Firstly
, there is an obvious difference between the depths of the
tunnels
. The Mont-Blanc
road
tunnel
is lay under a mountain which is 3.
5km
, while the maximum depth of the
Seikan
railway
tunnel
is
240km
underwater level.
In addition
, the lengths of the
railway
tunnel
are about 53.
85km
, compared to the
road
tunnel
is shorter,
just
11.
60km
.
Furthermore
, another difference between the two
tunnels
is that they spent more time constructing the
railway
tunnel
. It took 8 years to build the Mont-Blanc
road
tunnel
from 1957 to 1965. And the construction time of the
Seikan
railway
tunnel
in Japan was 42 years from 1946 to 1988.
Additionally
, the Japanese
tunnel
was built
under the sea whereas the
tunnel
linking France and Italy
was built
under a mountain.
Do not write below this line
Official use only
CC
7.0
LR
5.5
GR
5.5
TA
5.0
OVERALL BAND SCORE
6.0
Barcode 1
Barcode 1

IELTS academic The diagrams show the cross-sections of two tunnels, one joining France and Italy and the other joining two Japanese islands.

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Recent posts