Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
undefined eylem
Center Number:
1
2
3
4
   
Candidate Number:
2
4
4
7
4
Module (shade one box):
Academic:
 
General Training:
Test Date:
2
D
9
D
   
0
M
3
M
   
2
Y
0
Y
2
Y
2
Y

The diagram below show the site of a school in 2004 and the plan for change to the school site in 2024. Summarize the information by selecting and reporting the main features, and make comparison where relevant v.2

The diagram below show the site of a school in 2004 and the plan for change to the school site in 2024. yOM5J
The two pictures compare the layout of a school as it was in the year 2004 with a proposed site design for the year 2024. It is clear that the major change in 2024 includes the addition of a new academy construction. As a result, the school will then be able to accommodate a larger number of students. In 2004, 600 students attended the school, and the two educational institutionwere separated by a path running from the main entrance to the sports field. By 2024, it is expected that there will be 1000 students, and a third building will have been constructed. Furthermore, the plan is to join the two original buildings together and create a shorter path that connects the buildings. Since the third building and a second car park will be built on the site of the original sports field, a new, smaller sports field will need to be built. In addition, a new road will be constructed from the main entrance to the second parking lot. Finally, no changes will be made to the main entrance and original car park.
The two pictures compare the layout of a school as it was in the year 2004 with a proposed site design for the year 2024. It is
clear
that the major
change
in 2024 includes the addition of a new academy construction.
As a result
, the school will then be able to accommodate a larger number of students. In 2004, 600 students attended the school, and the two educational
institutionwere
separated by a path running from the main entrance to the sports field. By 2024, it is
expected
that there will be 1000 students, and a third building will have
been constructed
.
Furthermore
, the plan is to
join
the two original buildings together and create a shorter path that connects the buildings. Since the third building and a second car park will
be built
on the site of the original sports field, a new, smaller sports field will need to
be built
.
In addition
, a new road will
be constructed
from the main entrance to the second parking lot.
Finally
, no
changes
will
be made
to the main entrance and original car park.
Do not write below this line
Official use only
CC
7.0
LR
6.0
GR
6.5
TA
6.5
OVERALL BAND SCORE
6.5
Barcode 1
Barcode 1

IELTS academic The diagram below show the site of a school in 2004 and the plan for change to the school site in 2024.

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Recent posts