The plans below show a theatre in 2010 and 2012.
The plans below show a theatre in 2010 and 2012. mgL
The maps represents the changes in structure of theatre in 2010 and 2012. Overall, in reconstruction of theatre the auditorium of area had extended and added new four rooms. In 2010, viewers show only cafe when they entered in the main room while in 2012 there had constructed ticket office and restaurant opposite side of the ticket office. Area of auditorium was same in both years. In 2012 the dressing room has replaced by coordination and the the dressing room made in the lift corner. The admin office and storage exchanged with each other.
The maps
represents
the
changes
in structure of
theatre
in 2010 and 2012.
Overall
, in reconstruction of
theatre
the auditorium of area had extended and
added
new four
rooms
. In 2010, viewers
show
only
cafe
when they
entered in the main
room
while in 2012 there had constructed ticket office and restaurant opposite side of the ticket office. Area of auditorium was same in both years. In 2012 the dressing
room
has replaced by coordination and
the the
dressing
room
made in the lift corner. The admin office and storage exchanged with each other.
Do not write below this line