SOUTHWEST AIRPORT NOW AND AFTER DEVELOPEMENT MAP
SOUTHWEST AIRPORT NOW AND AFTER DEVELOPEMENT MAP gLVyD
The illustrated figure describes the SOUTHWEST Airport architecture and map of current airport and redevelopment plan has been proposed in order to make some changes in the current parts of the airport.
Currently, the airport is having 8 gates in order to enter inside the airport, from gate 1 to 4 there is a walkway for the passengers in order to enter inside the security passport control checks which needs to be followed before proceeding for departure. Once passengers complete their security checks, they can proceed into the cafeterias in order to wait for their departure, once timeline ends they can check in to the check in counter for their respective flights and can move forwards towards the departure area.
Similarly, for the passengers that are going arrive from the flights, they will have to take the arrival gate in order proceed for the passport control customs, after completing their formalities, they can exit from gate no 8 to 5.
Proposed plan after redevelopment of the airport will have 18 gates in total in order to proceed for departure and arrivals. in between to these gates the middle area will have sky trains to enter inside the airport. Gate number 1 to 9 are used for departure entrance. Once passenger enter inside these gates, they will find shops in between before going to the security passport control. Once they complete their security checks, they can wait in cafeteria and meanwhile period they can do self-check in baggage check in before moving towards the departure gate, departure gate will have two exits in order to proceed towards the aeroplane.
Similarly, for the passengers arriving from the arrival gate will also have 2 entrance arrival gate, and once they enter inside the arrival gate, they will be in cafeteria area where they can find facilities car hire, ATM. After spending some time here, passengers can move towards the passport control custom and after completing formalities they can proceed toward the exit gates from 10 to 18 and wait for their cars.
In conclusion, the redeveloped airport will have more area and space as well as lots of facilities than the old compact airport. New developed part will provide passengers with smooth in and out experience as well as larger areas which was not there in older map.
The illustrated figure
describes
the SOUTHWEST
Airport
architecture and map of
current
airport
and redevelopment plan has
been proposed
in
order
to
make
some
changes
in the
current
parts of the airport.
Currently
, the
airport
is having 8
gates
in
order
to
enter
inside
the
airport
, from
gate
1 to 4 there is a walkway for the
passengers
in
order
to
enter
inside
the
security
passport
control
checks
which needs to
be followed
before
proceeding for
departure
.
Once
passengers
complete their
security
checks
, they can
proceed
into the cafeterias in
order
to wait for their
departure
,
once
timeline ends they can
check
in to the
check
in counter for their respective flights and can
move
forwards towards the
departure
area.
Similarly
, for the
passengers
that are going arrive from the flights, they will
have to
take the
arrival
gate
in
order
proceed
for the
passport
control
customs, after completing their formalities, they can exit from
gate
no 8 to 5.
Proposed plan after redevelopment of the
airport
will have 18
gates
in total in
order
to
proceed
for
departure
and
arrivals
.
in
between to these
gates
the middle
area
will have sky trains to
enter
inside
the
airport
.
Gate
number 1 to 9 are
used
for
departure
entrance.
Once
passenger
enter
inside
these
gates
, they will find shops in between
before
going to the
security
passport
control
.
Once
they complete their
security
checks
, they can wait in cafeteria and meanwhile period they can do self-
check
in baggage
check
in
before
moving towards the
departure
gate
,
departure
gate
will have two exits in
order
to
proceed
towards the
aeroplane
.
Similarly
, for the
passengers
arriving from the
arrival
gate
will
also
have 2 entrance
arrival
gate
, and
once
they
enter
inside
the
arrival
gate
, they will be in cafeteria
area
where they can find facilities car hire, ATM. After spending
some
time here,
passengers
can
move
towards the
passport
control
custom and after completing formalities they can
proceed
toward the exit
gates
from 10 to 18 and wait for their cars.
In conclusion
, the redeveloped
airport
will have more
area
and space
as well
as lots of facilities than the
old
compact
airport
. New developed part will provide
passengers
with smooth in and out experience
as well
as larger
areas
which was not there in older map.
Do not write below this line