Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
Hà Thu
Center Number:
1
2
3
4
   
Candidate Number:
4
4
5
0
Module (shade one box):
Academic:
 
General Training:
Test Date:
3
D
1
D
   
1
M
0
M
   
2
Y
0
Y
2
Y
3
Y

present building of a college and future site of college of 2020

present building of a college and future site of college of 2020 P36Jd
The presented diagram provides the present building of a collage and the plans to change the site in the future of 2020. Overall, it is visible that there would be many changes from the college site in 2020. As is illustrated the entrance of the collage site was changed from the top to the bottom. In addition, Many rooms and places had also changed, However some stayed in the same place as the Lunch area. It is clear that the garden had been removed as well as the footpath on both side and top part of the building. According to the present site, It is visible that the entrance is at the top part of the building along with the garden and footpath, The diagram reveals that, After the entrance there is a lunch room as well as a classroom on the opposite side. We can see that there is also the reception next to the classroom as well as the library and toilets. In the present site it is visible that the college is not too well built. Now, Turning to the details on the site of 2020. First of all, many of the structures were removed, For example, the garden and footpath as well as the entrance being moved to the bottom side of the collage. In Addition, many classrooms were added and some structures were moved to a different area. It is interesting to note that the Reception was moved a bit further but in front of the entrance. It is clearly visible that the library was moved to the left side of the building just below the lunch area and classroom.
The presented diagram provides the present building of a collage and the plans to
change
the
site
in the future of 2020.
Overall
, it is
visible
that there would be
many
changes
from the college
site
in 2020.
As
is illustrated
the
entrance
of the collage
site
was
changed
from the top to the bottom.
In addition
,
Many
rooms and places had
also
changed
,
However
some
stayed in the same place as the Lunch area. It is
clear
that the garden had
been removed
as
well
as the footpath on both side and top part of the building. According to the present
site
, It is
visible
that the
entrance
is at the top part of the building along with the garden and footpath, The diagram reveals that, After the
entrance
there is a lunch room as
well
as a classroom on the opposite side. We can
see
that there is
also
the reception
next
to the classroom as
well
as the library and toilets. In the present
site
it is
visible
that the college is not too
well built
.
Now
, Turning to the
details
on the
site
of 2020.
First of all
,
many
of the structures
were removed
,
For example
, the garden and footpath as
well
as the
entrance
being
moved
to the bottom side of the collage.
In Addition
,
many
classrooms were
added
and
some
structures were
moved
to a
different
area. It is interesting to note that the Reception was
moved
a bit
further
but
in front of the
entrance
. It is
clearly
visible
that the library was
moved
to the
left
side of the building
just
below the lunch area and classroom.
Do not write below this line
Official use only
CC
5.5
LR
5.5
GR
6.5
TA
5.0
OVERALL BAND SCORE
5.5
Barcode 1
Barcode 1

IELTS essay present building of a college and future site of college of 2020

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Copy promo code:wkKy7
Copy
Recent posts









Get more results for topic: