Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
Siby Bright Joe
Center Number:
1
2
3
4
   
Candidate Number:
2
8
6
6
Module (shade one box):
Academic:
 
General Training:
Test Date:
2
D
7
D
   
0
M
1
M
   
2
Y
0
Y
2
Y
3
Y

The street plans below show a residential area with a park and a playground in 2016 and the proposed changes for 2025 to make it safer for families and children

The street plans below show a residential area with a park and a playground in 2016 and the proposed changes for 2025 to make it safer for families and children RAAWP
The two maps highlight the changes that will take place in a residential area with a park and a playground from 2016 to 2025 in order to protect the safety of families and children. Overall, it is clear that a residential area with a park and a playground can probably undergo some transformations over the period of nine years with relocation and the addition of new protective and convenient equipment. A closer look at the maps shows that the residential area near the north side of the High Road will be relocated to the north far away from it, in order to give way to the railings. Besides, the railings will also be introduced to the opposite side of the High Road, along two sides of the road. Furthermore, to prevent children from unworthy accidents and to slow down the traffic, a traffic light system will be opened to the corner of each road. For instance, one can be put at the corner of Bridge Street and High Road, the rest of four will respectively be installed at each intersection of Tennis Street, Bridge Street, Hatton Avenue and Bond Way. A final possible plan that can be applied is that the installation of a roundabout at the intersection of the above-mentioned streets.
The two maps highlight the
changes
that will take place in a residential area with a park and a playground from 2016 to 2025 in order to protect the safety of families and children.
Overall
, it is
clear
that a residential area with a park and a playground can
probably
undergo
some
transformations over the period of nine years with relocation and the addition of new protective and convenient equipment. A closer look at the maps
shows
that the residential area near the north side of the High
Road
will
be relocated
to the north far away from it, in order to give way to the railings.
Besides
, the railings will
also
be introduced
to the opposite side of the High
Road
, along two sides of the road.
Furthermore
, to
prevent
children from unworthy accidents and to slow down the traffic, a traffic light system will
be opened
to the corner of each
road
.
For instance
, one can
be put
at the corner of Bridge
Street
and High
Road
, the rest of four will
respectively
be installed
at each intersection of Tennis
Street
, Bridge
Street
,
Hatton
Avenue and Bond Way. A final possible plan that can
be applied
is that the installation of a roundabout at the intersection of the above-mentioned
streets
.
Do not write below this line
Official use only
CC
5.5
LR
5.5
GR
6.5
TA
6.0
OVERALL BAND SCORE
5.0
Barcode 1
Barcode 1

IELTS essay The street plans below show a residential area with a park and a playground in 2016 and the proposed changes for 2025 to make it safer for families and children

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Recent posts