Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
Sharma Nishu
Center Number:
1
2
3
4
   
Candidate Number:
9
6
9
0
Module (shade one box):
Academic:
 
General Training:
Test Date:
2
D
2
D
   
0
M
6
M
   
2
Y
0
Y
2
Y
2
Y

School site infrastructure

School site infrastructure 09R9Q
The two pictures compare the layout of School site infrastructure as it was in the year 2004 with its proposed site design for the year 2024. Overall, it is clear that the plan is to create many places for students by constructing a new school building, new road and second car park as well as relocating sports field. As for the original layout of school, the school consisted of two buildings with a path between them which led sports field at the end of the it. Main entrance for the school was through building one which had car park in front of it. According to the second illustration, main entrance won’t have changed while one huge school building will have been built instead of previously available sports field. New sports field building will have built in the garden which new road will have crossed it while it has fresh built second car park. The old path will have been shorter than the new one as a result of constructing a corridor which connect with school one and two.
The two pictures compare the layout of
School
site infrastructure as it was in the year 2004 with its proposed site design for the year 2024.
Overall
, it is
clear
that the plan is to create
many
places for students by constructing a
new
school
building
,
new
road and second car park
as well
as relocating
sports
field. As for the original layout of
school
, the
school
consisted of two
buildings
with a path between them which led
sports
field at the
end
of the it. Main entrance for the
school
was through
building
one which had car park in front of it. According to the second illustration, main entrance won’t have
changed
while one huge
school
building
will have
been built
instead
of previously available
sports
field.
New
sports
field
building
will have built in the garden which
new
road will have crossed it while it has fresh built second car park. The
old
path will have been shorter than the
new
one
as a result
of constructing a corridor which connect with
school
one and two.
Do not write below this line
Official use only
CC
5.5
LR
5.5
GR
6.5
TA
6.0
OVERALL BAND SCORE
5.0
Barcode 1
Barcode 1

IELTS essay School site infrastructure

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Copy promo code:KY6Y7
Copy
Recent posts