Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
mohammadkhani parisa
Center Number:
1
2
3
4
   
Candidate Number:
1
5
2
8
0
Module (shade one box):
Academic:
 
General Training:
Test Date:
0
D
8
D
   
1
M
2
M
   
2
Y
0
Y
2
Y
0
Y

overall, it is observed that in present water supply system dispose waste water and storm water into river, but in future that water will be reused after doing treatment.

overall, it is observed that in present water supply system dispose waste water and storm water into river, but in future that water will be reused after doing treatment. AgN
The rendered map depicts the information regarding the system of water providing nowadays and in future in country Australia. Describing about present water supply scenario, where pure water is in dam or storage which is located at North West side that water is transfer to households, shops, factories and cities which is at North east direction. By following this, waste water is received by water treatment plant at South west location before going into river and in last, waste water as well as storm water is mix up with river which is at south. Analyzing about future water supply system projection, Dam on storage will be in same position which is like in present and supply pure water at North east direction to households, shops, factories and city area. Furthermore, storm water and waste water will be transfer into water treatment plant instead of throwing it into river but interestingly, that used water will again reuse by urban area and projection of every domain will keep in same direction as in present. overall, it is observed that in present water supply system dispose waste water and storm water into river, but in future that water will be reused after doing treatment.
The rendered map depicts the information regarding the system of
water
providing nowadays and in future in country Australia. Describing about present
water
supply
scenario, where pure
water
is in dam or storage which
is located
at North West side that
water
is transfer to households, shops, factories and cities which is at North east direction. By following this,
waste
water
is received
by
water
treatment plant at South west location
before
going into
river
and in last,
waste
water
as well
as storm
water
is mix up with
river
which is at south. Analyzing about future
water
supply
system projection, Dam on storage will be in same position which is like in present and
supply
pure
water
at North east direction to households, shops, factories and city area.
Furthermore
, storm
water
and
waste
water
will be transfer into
water
treatment plant
instead
of throwing it into
river
but
interestingly
, that
used
water
will again reuse by urban area and projection of every domain will
keep
in same direction as in present.
overall
, it
is observed
that in present
water
supply
system dispose
waste
water
and storm
water
into
river
,
but
in future that
water
will
be reused
after doing treatment.
Do not write below this line
Official use only
CC
7.0
LR
5.5
GR
6.5
TA
6.5
OVERALL BAND SCORE
6.5
Barcode 1
Barcode 1

IELTS academic overall, it is observed that in present water supply system dispose waste water and storm water into river, but in future that water will be reused after doing treatment.

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Recent posts