Check your IELTS writing task 1 and essay, this is a free correction and evaluation service.
Check IELTS Writing it's free
British CouncilIDPCambridge
IELTS Writing Answer Sheet
Barcode 3
Candidate Name:
Huy Anh
Center Number:
1
2
3
4
   
Candidate Number:
1
8
5
0
4
Module (shade one box):
Academic:
 
General Training:
Test Date:
2
D
8
D
   
0
M
2
M
   
2
Y
0
Y
2
Y
2
Y

map, difference, two tunnels

map, difference, two tunnels BQ96j
The maps describe the two underground tunnel systems which was built in two Australian cities. In general, the two underground tunnel systems have significant differences in regard with size, location, depth and height and cost as well. The first tunnel took twelve years to build from 1986 to 1998. It was built underneath a body of water and sand. The length was 2. 2 kilometers long and only four vehicles could travelled on the lane. Additionally, it was around 1. 5 meters high and it cost $555 millon. The second tunnel took only four years to complete. However, the cost was almost double in comparison with the first tunnel. Moreover, it was buit under the road infrastructure, beneath the layer of stone and clay. The length was also longer than the first, with 3. 6 km as well as its height was 2. 5 meters. Six vehicles can travel parallely on the lane.
The maps
describe
the two underground
tunnel
systems which
was built
in two Australian cities.
In general
, the two underground
tunnel
systems have significant differences in regard with size, location, depth and height and cost
as well
. The
first
tunnel
took twelve years to build from 1986 to 1998. It
was built
underneath a body of water and sand. The length was 2. 2 kilometers long and
only
four vehicles could
travelled
on the lane.
Additionally
, it was around 1. 5 meters high and it cost $555
millon
. The second
tunnel
took
only
four years to complete.
However
, the cost was almost double
in comparison
with the
first
tunnel
.
Moreover
, it was
buit
under the road infrastructure, beneath the layer of stone and clay. The length was
also
longer than the
first
, with 3. 6 km
as well
as its height was 2. 5 meters. Six vehicles can travel
parallely
on the lane.
Do not write below this line
Official use only
CC
7.0
LR
5.5
GR
6.5
TA
5.0
OVERALL BAND SCORE
6.0
Barcode 1
Barcode 1

IELTS academic map, difference, two tunnels

👍 High Quality Evaluation

Correction made by newly developed AI

✅ Check your Writing

Paste/write text, get result

⭐ Writing Ideas

Free for everyone

⚡ Comprehensive report

Analysis of your text

⌛ Instant feedback

Get report in less than a second

Copy promo code:VDdAe
Copy
Recent posts